HANUL D&B
AboutBusinessTechnologyProjectsContact

Major Projects

Browse the projects delivered by HANUL D&B, by category

All49Tunnel Design4BIM Design4Earth Retaining Design5Underground Safety Assessment8Post-Commencement Safety Survey2Underground Safety Assurance5Stability Review & Numerical Analysis13Ground & Hydrogeological Investigation8
ALL PROJECTS49

Tunnel Design

04
P-01

Namil–Boeun road construction: Surity Tunnel emergency bay design revision

Design revision for the tunnel emergency parking bay section

TunnelDesign Revision
P-02

Western Inland Expressway: design support for on-site revisions

Technical support for on-site tunnel design revisions

TunnelDesign Support
P-03

Sinansan Line Shaft #11: pillar stability and tie-bolt applicability review

Structural stability and reinforcement review of a subway tunnel pillar

TunnelStability Review
P-04

Miryang Muan–Bubuk national road: basic and detailed design

Full basic and detailed design for the national road tunnel section

TunnelDetailed Design

BIM Design

04
P-05

Gyeongui–Jungang Line Baengma–Pungsan: Pungdong district external urban infrastructure

BIM modeling and quantity take-off for urban infrastructure

BIMQuantity Take-off
P-06

Block C1 residential development: civil as-is BIM model construction

As-is civil BIM modeling for a residential construction site

BIMAs-is Model
P-07

KTX direct connection: new roadbed works BIM services

BIM model construction for a new KTX roadbed section

BIMRailway
P-08

Hadong Combined Cycle Unit 1: cooling water discharge tunnel BIM modeling

BIM modeling of a power plant cooling water discharge tunnel

BIMDischarge Tunnel

Earth Retaining Design

05
P-09

Yonghyeon-dong 684 youth housing: earth retaining design

Earth retaining design for a youth housing site

Earth RetainingResidential
P-10

Ganseok-dong LH youth housing (5 lots): earth retaining design

Earth retaining design for an LH youth housing site

Earth RetainingLH
P-11

Incheon Geomdan District 3, Block 1 Lot 5 neighbourhood facility: earth retaining design

Earth retaining and ancillary civil design for a neighbourhood facility

Earth RetainingAncillary Civil
P-12

Seongnam water treatment plant discharge facility upgrade: soil and foundation scope

Soil and foundation design for a water treatment plant upgrade

Soil & FoundationEnvironmental Facility
P-13

Haan-dong public sewerage (storage facility and pipeline): basic and detailed design

Basic and detailed design for sewage storage and pipelines

SewerageDetailed Design

Underground Safety Assessment

08
P-14

Gimje Seoam-dong residential: small-scale underground safety assessment

Small-scale underground safety assessment for a residential development

Small-scaleResidential
P-15

Yonghyeon-dong 684 youth housing: small-scale underground safety assessment

Small-scale underground safety assessment for youth housing

Small-scaleResidential
P-16

Ganseok-dong LH youth housing (5 lots): small-scale underground safety assessment

Small-scale underground safety assessment for LH youth housing

Small-scaleLH
P-17

Suwon Dangsu district external stream improvement: underground safety reassessment

Underground safety reassessment for a stream improvement project

ReassessmentStream
P-18

Cheorwon landfill (Galmal-eup, Gangpo-ri): underground safety assessment

Underground safety assessment for a landfill development

Safety AssessmentLandfill
P-19

Luwon City Gajeong district Block 1-1 neighbourhood facility: small-scale underground safety assessment

Small-scale underground safety assessment for a neighbourhood facility

Small-scaleCommercial
P-20

Indeogwon–Dongtan double-track railway: ventilation shaft underground safety reassessment

Underground safety reassessment for a railway ventilation shaft

ReassessmentRailway
P-21

Honam High-Speed Rail Phase 2 (Gomagwon–Mokpo): underground safety reassessment

Underground safety reassessment for a high-speed rail project

ReassessmentHigh-Speed Rail

Post-Commencement Safety Survey

02
P-22

Uiwang Baegun Valley: school underpass construction post-commencement underground safety survey

Post-commencement underground safety survey for a school underpass

Post-CommencementUnderpass
P-23

Hyundai Steel industrial complex landfill: post-commencement underground safety survey

Post-commencement underground safety survey for an industrial landfill

Post-CommencementLandfill

Underground Safety Assurance

05
P-24

Sinansan Line: safety assurance plan for cut-and-cover box temporary works revision (up line)

Underground safety assurance plan following a cut-and-cover box temporary works revision

Safety AssuranceCut-and-Cover
P-25

Sinansan Line: safety assurance plan for cut-and-cover box temporary works (TYPE A3–A4) plan change

Underground safety assurance plan for a revised temporary works plan

Safety AssuranceTemporary Works
P-26

Sinansan Line: safety assurance plan for ventilation shaft #10 temporary works revision

Underground safety assurance plan for a ventilation shaft following a staging change

Safety AssuranceVentilation Shaft
P-27

Sinansan Line: safety assurance plan for the Wolgot–Pangyo junction temporary works revision

Underground safety assurance plan for a line junction temporary works revision

Safety AssuranceJunction
P-28

Sinansan Line station Entrance 1: safety assurance plan for temporary works revision

Underground safety assurance plan for a station entrance temporary works revision

Safety AssuranceStation

Stability Review & Numerical Analysis

13
P-29

K-Square Grand Gangseo PFV: Jeungmi Station subway structure stability review

3D numerical analysis of stability for structures adjacent to a subway

Stability ReviewSubway
P-30

Yongdap-dong redevelopment: Dapsimni Station entrance and ventilation shaft stability review

Stability review of a station entrance and ventilation shaft next to a redevelopment site

Stability ReviewSubway
P-31

Seongnam Bokjeong district residential (A-3BL): subway stability review

Review of subway impact during residential construction

Stability ReviewResidential
P-32

Chungcheong Inland Expressway: corrugated steel plate tunnel displacement cause analysis and countermeasures

Cause analysis and countermeasures for corrugated steel plate tunnel displacement

Cause AnalysisCSP Tunnel
P-33

KCC E&C Samseong–Dongtan GTX: 3D shaft stability review and reporting

3D FEM stability analysis of a GTX shaft

3D AnalysisShaft
P-34

Guro communication tunnel: detailed design for crack repair and reinforcement

Detailed design for repairing and reinforcing a cracked communication tunnel

RepairDetailed Design
P-35

Sinansan Line: stability review for start-point up-line temporary works revision

Stability review for a revised temporary works section at the line start

Stability ReviewTemporary Works
P-36

Sinansan Line: stability review for secondary ventilation shaft temporary works revision

Stability review for a secondary ventilation shaft temporary works revision

Stability ReviewVentilation Shaft
P-37

Sinansan Line: stability review for a tunnel support pattern change at the line start

Stability review following a tunnel support pattern change

Stability ReviewTunnel
P-38

Sinansan Line: stability review of a tunnel crossing section

Structural stability review of a tunnel crossing section

Stability ReviewCrossing
P-39

Sinansan Line: additional stability review for a shaft support pattern change

Additional stability review following a shaft support pattern change

Stability ReviewShaft
P-40

Gunpo Daeyami district B3 residential: blasting analysis through 3D numerical modeling

3D numerical analysis of blasting impact at a residential site

3D AnalysisBlasting
P-41

EcoPro EM: ground settlement analysis and reinforcement countermeasures

Settlement cause analysis and reinforcement countermeasures

SettlementReinforcement

Ground & Hydrogeological Investigation

08
P-42

Field application of soil flushing for inorganic contamination in the vadose zone

Field application of soil flushing technology in the vadose zone

Soil RemediationField Application
P-43

Staged optimal site investigation R&D: deep borehole drilling and survey

Deep borehole drilling and survey for site investigation method validation

Deep BoreholeValidation
P-44

Gocheok 1-dong underground car park: ground investigation for basic and detailed design

Ground investigation for underground car park design

Ground InvestigationCar Park
P-45

154kV Migeum–Deokso transmission tower undergrounding: ground investigation

Ground investigation for a transmission line undergrounding section

Ground InvestigationUndergrounding
P-46

Gimje Seoam-dong residential development: ground investigation

Ground investigation for a residential development site

Ground InvestigationResidential
P-47

Jamsu Bridge accessibility improvement: ground investigation for basic and detailed design

Ground investigation for a bridge accessibility improvement project

Ground InvestigationBridge
P-48

30th Division site soil remediation: ground investigation for basic design

Ground investigation for a soil remediation basic design

Ground InvestigationSoil Remediation
P-49

Staged optimal site investigation R&D: deep-depth ground investigation trials

Deep-depth ground investigation for site investigation method validation

Deep DrillingValidation