HANUL D&B
AboutBusinessTechnologyProjectsContact

Major Projects

Browse the projects delivered by HANUL D&B, by category

All49Tunnel Design4BIM Design4Earth Retaining Design5Underground Safety Assessment8Post-Commencement Safety Survey2Underground Safety Assurance5Stability Review & Numerical Analysis13Ground & Hydrogeological Investigation8
Stability Review & Numerical Analysis13

Stability Review & Numerical Analysis

13
P-29

K-Square Grand Gangseo PFV: Jeungmi Station subway structure stability review

3D numerical analysis of stability for structures adjacent to a subway

Stability ReviewSubway
P-30

Yongdap-dong redevelopment: Dapsimni Station entrance and ventilation shaft stability review

Stability review of a station entrance and ventilation shaft next to a redevelopment site

Stability ReviewSubway
P-31

Seongnam Bokjeong district residential (A-3BL): subway stability review

Review of subway impact during residential construction

Stability ReviewResidential
P-32

Chungcheong Inland Expressway: corrugated steel plate tunnel displacement cause analysis and countermeasures

Cause analysis and countermeasures for corrugated steel plate tunnel displacement

Cause AnalysisCSP Tunnel
P-33

KCC E&C Samseong–Dongtan GTX: 3D shaft stability review and reporting

3D FEM stability analysis of a GTX shaft

3D AnalysisShaft
P-34

Guro communication tunnel: detailed design for crack repair and reinforcement

Detailed design for repairing and reinforcing a cracked communication tunnel

RepairDetailed Design
P-35

Sinansan Line: stability review for start-point up-line temporary works revision

Stability review for a revised temporary works section at the line start

Stability ReviewTemporary Works
P-36

Sinansan Line: stability review for secondary ventilation shaft temporary works revision

Stability review for a secondary ventilation shaft temporary works revision

Stability ReviewVentilation Shaft
P-37

Sinansan Line: stability review for a tunnel support pattern change at the line start

Stability review following a tunnel support pattern change

Stability ReviewTunnel
P-38

Sinansan Line: stability review of a tunnel crossing section

Structural stability review of a tunnel crossing section

Stability ReviewCrossing
P-39

Sinansan Line: additional stability review for a shaft support pattern change

Additional stability review following a shaft support pattern change

Stability ReviewShaft
P-40

Gunpo Daeyami district B3 residential: blasting analysis through 3D numerical modeling

3D numerical analysis of blasting impact at a residential site

3D AnalysisBlasting
P-41

EcoPro EM: ground settlement analysis and reinforcement countermeasures

Settlement cause analysis and reinforcement countermeasures

SettlementReinforcement